Predicting bunching costs for the Radio Horse 9 winch

Publication Toolbox

  • Download PDF (753015)
  • This publication is available only online.
LeDoux, Chris B.; Kling, Bruce W.; Harou, Patrice A.; Harou, Patrice A.

Year Published

1987

Publication

NE-RP-595. Broomall, PA: US. Department of Agriculture, Forest Service, Northeastern Forest Experiment Station. 7 p.

Abstract

Data from field studies and a prebunching cost simulator have been assembled and converted into a general equation that can be used to estimate the prebunching cost of the Radio Horse 9 winch. The methods can be used to estimate prebunching cost for bunching under the skyline corridor for swinging with cable systems, for bunching to skid trail edge to be picked up by a skidder or forwarder, or bunching to roadside for stand cleanings and firewood sales. Costs can be determined easily with a hand calculator. The equation can also be incorporated into larger stump-to-mill desktop and mainframe computer programs.

Keywords

pebunching; deck spacing

Citation

LeDoux, Chris B.; Kling, Bruce W.; Harou, Patrice A. 1987. Predicting bunching costs for the Radio Horse 9 winch. NE-RP-595. Broomall, PA: US. Department of Agriculture, Forest Service, Northeastern Forest Experiment Station. 7 p. https://doi.org/10.2737/NE-RP-595.